The drywall is up and it's been textured to match the existing walls. In fact, the wall almost looks too good. At the last minute they decided to put a molding on the top of the walls to make it more finished.
The second photo is the work left to do. There's patch work where walls have been torn down. The sprinkler pipes above and to the right of the bathroom need to be put and capped. There's an electrical line that needs to be cut and capped as well.
There was some discussion about the quality of the contracting work to close off the doorways between the suites. Our contractor and the painting guys both questioned the job. I'm assured that a second group will be coming in to texture and clean up before painting begins.